Performance Certification The strongest company in the production of customizing valve and the technology innovation for building the power generation facility!
The Strong Of Technical Renovation
Performance Certification The strongest company in the production of customizing valve and the technology innovation for building the power generation facility!
No. | Name of power plant | Name of system | Size | Scope of application |
---|---|---|---|---|
1 | Samcheonpo Thermal Power | BLR Units 1 and 2 #4 HTR NOR DRN | 2-1/2“ | C/V Trim Part |
BLR Unit 2 STM Coil Air HTR | 6“ | C/V Trim Part | ||
BLR Units 1 and 2 RH Spray | 3“ | C/V Trim Part | ||
BLR Unit 4 SB PCV 01 | 2“ | C/V Trim Part | ||
BLR Unit 4 RH Spray | 3“ | C/V Trim Part | ||
BLR Unit 4 Long & Short DRN TCV | 3“ | C/V Trim Part | ||
BLR Unit 4 SB | 2-1/2“ | Poppet v/v Disc&Stem | ||
TBN Units 3 and 4 BFPT Min Flow Recir’ | 6“ | C/V Trim Part | ||
TBN Units 1 and 2 BFPT Min Flow Recir’ | 4“ | C/V Trim Part | ||
TBN Units 1 and 2 BFPM Disch’ | 8“ | C/V Trim Part | ||
TBN Unit 1 MS HDR DRN | 4“-4500LB | Globe v/v Ass’y | ||
BLR Units 1 and 2 SB PCV 01 | 2“ | C/V Trim Part | ||
BLR Unit 1 STM Coil Air HTR | 6“ | C/V Trim Part | ||
BLR Units 1 and 2 RH Block | 4“ | C/V Trim Part | ||
BLR Units 1 and 2 RH Spray | 3“ | C/V Trim Part | ||
BLR Units 1 and 2 SB TCV | 3“ | C/V Trim Part | ||
Unit 2 desulfurization | 1“, 2”, 3“, 4” | Soft Seat Ball v/v Ass’y | ||
2 | Donghae Thermal Power | FW HTR No.6 LCV-06 | 6“ | C/V Trim Part |
FW HTR No.7 LCV-07 | 6“ | C/V Trim Part | ||
FW HTR No.8 LCV-08 | 4“ | C/V Trim Part | ||
BLR Unit 1 SB PCV | 2“ | C/V Cage | ||
3 | Yeosu Thermal Power | #5 HP HTR DRN Level Emergency | 10“ | C/V Trim Part |
#7 HP HTR DRN Level Emergency | 8“ | C/V Trim Part | ||
4 | Namjeju Thermal Power | BLR Units 1 and 2 AS PCV 03 | 2“ | C/V Trim Part |
BLR Units 1 and 2 SB PCV 01 | 2“ | C/V Ass’y | ||
5 | Jeju Thermal Power | Units 2 and 3 Scavenge | 1/2“ | Metal Touch Ball v/v Ass’y |
6 | Honam Thermal Power | R7 HTR LCV | 2-1/2“ | C/V Ass’y |
7 | Yeongdong Thermal Power | BLR Unit 2 SH Spray Sub | 2“ | C/V Trim Part |
8 | Taean Thermal Power | FW HTR No.4 LCV | 4“ | C/V Ass’y |
9 | Yangyang Yasu Power Plant | For inlet side By-Pass piping | 3“, 4”, 6“ | Ball v/v Ass’y |